Autonomous Maintenance in the TPM functions to change the old paradigm operators i.e. operators that wear "machine, the technician. Who takes care and repair, replace by a new paradigm i.e. operators that wear then the operator also who take care of .
This pillar aims to improve the ability of the operator to perform the independent care against the machine. So that when the machine undergoes a breakdown not too tie. To the technician as such breakdown will more quickly be solve.
After the 7 steps in AM already running goal which hopefully is the ability of the operator is equivalent to technician.
What is the 7 steps in implementing the PM? following the steps
Step 1: Initial Cleaning
Initial cleaning initial cleaning activities are undertaken to return the machine to the State it all.
Activity that is done is cleansing, but cleaning not merely cleaning up well. But this is the grade cleanup at the same time check whether the bolts, cables, part of the machine in the appropriate State/good.
So in the initial cleaning purge is check.
This initial cleaning activity should involve all parts even in some places up to top management/minimum head factory join clean up. The share machine operator, technician, and some of the supporting pillar.
These activities will find a problem/deviation minor or major that are pour in the form finding problems. From my experience a minimal anyway the problem machine was found 100 more 80s:)
Step 2: Remove the source of the Contamination
Of the problems found at the time of initial cleaning evaluate their causes. So the problem was found when the initial cleaning is not expect to happen again. As well as the difficult areas clean are identify and carry out improvement to ease clean. The core of this activity is to make the machine easier to clean. As well as its pollutant sources can be eliminate or at least reduce.
For example there is the material the rest of the product. Where the origin of the materials it sought the source and be solve as well as facilitate the operator in cleaning machines.
Step 3: the standard cleaning and Lubrication (temporary standard)
In this step will be made standard cleaning & lubrication of machines that are temporary. With the aim of familiarizing the operator to check as well as taking care of the machine.
Usually a standard that was create not too hard, and is lightweight. Suggestions from the author, so that standard made her not too many items.
Out of habit, from the operator never has the activity of examination. Thus were told to check in with a lot of items, the item just checks it out on the check only, not the actual review:
In order for this 3 step walk effectively don't forget to educate operators of lubrication first Yes, let ngak operators confuse.
Step 4: a thorough Inspection (Inspection)
In this step the operator is direct to more skill in inspecting the condition of the engine, by means of educating operators in order. To understand the structure, function, and method of inspection of equipment.
In addition, the operator will overwhelm the treatment procedure.
CLIT or the length of the Cleaning, Lubricating, tightening inspections, is an activity that will be implant to the operator. The success of this event was seen by decreasing time to perform a CLIT. As operators increasingly understand the structure of the machine, and the more familiar in doing activity CLIT.
Step 5: standards of care (Independent Examination)
The main activities in this step is to set standards and the schedule for completing self-service maintenance activities base on the equipment.
Then the operators perform routine maintenance with proper standards, and focus to achieve zero breakdown.
The Operator will be develop to understand the equipment as a whole system. Develop the capability to detect signs of abnormalities in order to prevent the existence of breakdown. As well as train operators to knowledgeable of many.
Step 6: Management and organization of work (Quality Assurance Process)
Activities perform in this step is to prevent damage product results to the next process, prevent the produce/manufacture products. That are damage/defects, achieving the quality assurance process and continues to zero defects.
The Operator will be develop to enhance knowledge of the equipment. The quality which aims in the charging status of the new techniques, and produces independent supervision in every operator.
Poka Yoke Tools will support in step six.
Step 7: Independent Care Full
Activities perform in this step is to prevent damage product results to the next process, prevent the produce/manufacture products. That are damage/defects, achieving the quality assurance process and continues to zero defects.
The Operator will be develop to enhance knowledge of the equipment. The quality which aims in the charging status of the new techniques, and produces independent supervision in every operator.
Poka Yoke Tools will support in step six.
Step 7: Independent Care Full
Activities perform in this step is to maintain, enhance and redirect (at the new officials/employees) level of TPM that has been achieve.
Operators with earnest built self-supervision in order to develop a strategy of the factory with the groups PM on his own without the detail instruction of the Manager. As well as detecting and solving the problems that arise with the groups PM on his own by way of a brief repair program.