The project proposal is also known as project project application or project application report, the next small editor for everyone to recommend is the project proposal template, welcome to read.
Project proposal template
chapter 1 generalization of reporting units and projects
first, the project declaration unit summary
including the name of the reporting unit's main business, operating years, assets and liabilities, shareholder composition, major investment projects, existing production capacity and other content.
second, the project summary
including the construction background of the proposed project, construction site, main construction content and scale, product and engineering technology program, major equipment selection and supporting projects, investment scale and financing program.
chapter ii development planning, industrial policy and industry access analysis
first, development planning analysis
whether the proposed project meets the requirements of the relevant national economic and social development master plan, special plan and regional plan, and whether the project objectives and planning contents are connected and coordinated.
second, industrial policy analysis
whether the proposed project meets the requirements of the relevant industrial policy.
third, industry access analysis
whether the project construction unit and the proposed project comply with the relevant industry access standards.
chapter three resource development and comprehensive utilization analysis
first, resource development programs
resource development projects, including the development of metal ore, coal mines, oil and gas mines, building materials ore and water (force), forests and other resources, should analyze the amount of development, natural quality, storage conditions, development value, etc., to evaluate whether the comprehensive utilization of resources is in line with the requirements.
second, the use of resources program
include the variety, quantity and source of important resources to be occupied by the project; comprehensive utilization schemes for resources such as polymetallic, multi-purpose chemical elements symbiotic, associated ore and oil and gas mixed ore; through the comparative analysis of the main resource consumption index per unit of production capacity, the advanced degree of resource utilization efficiency is evaluated. analysis and evaluation of whether the construction of the project will adversely affect other resources such as surface (below) water.
third, resource conservation measures
the main measures for various types of metal ore, non-metallic ore and water resource conservation as raw materials in the project plan are expounded. this paper analyzes the resource consumption index of the proposed project, expounds the main measures in improving the efficiency of resource utilization and reducing the consumption of resources, and demonstrates whether it meets the relevant requirements of resource conservation and effective utilization.
chapter four analysis of energy saving schemes
first, energy standards and energy-saving norms
this paper expounds the national and local reasonable energy use standards and energy-saving design specifications followed by the proposed project.
second, the state of energy consumption and energy consumption indicators analysis
explain the location of the project. energy supply situation, analysis of the type and quantity of energy consumption of the proposed project. according to the characteristics of the project to choose and calculate various types of energy consumption indicators, with the international and domestic advanced level of comparative analysis, to explain whether the requirements of energy access standards.
third, energy-saving measures and energy-saving effect analysis
this paper expounds the main energy saving measures adopted by the proposed project in order to optimize the energy structure and meet the relevant technical policies and design standards, and analyzes and demonstrates the energy saving effect.
chapter v analysis of construction land, land acquisition and relocation and resettlement
The project site selection and land use plan
including the project construction site, land area, land use status, occupation of cultivated land and other content. analysis of whether the site selection of the project will cause related adverse effects, such as whether the cladding of deposits and cultural relics, whether it is conducive to flood control and flood control, whether it affects navigation and military facilities.
project application report - model project report
analysis of the rationality of land use
analysis of whether the proposed project meets the requirements of land use planning, whether the scale of land occupied is reasonable, whether it meets the requirements of intensive and effective use of land, whether the supplementary scheme of farmland occupation is feasible, etc.
Land acquisition and relocation and resettlement planning programs
to investigate and analyze the impact of land acquisition and demolition of proposed projects, put forward the principles, scope and methods of compensation for demolition according to law, formulate a plan for resettlement of immigrants, and analyze and demonstrate whether it meets the requirements of safeguarding the legitimate rights and interests of immigrants and meeting the survival and development needs of immigrants.
Chapter 6 environmental and ecological impact analysis
environmental and ecological status quo
including the natural environment conditions of the project site, existing pollutants, ecological environment conditions and environmental capacity conditions.
analysis of the impact of ecological environment
including the type of pollutants emitted, emission analysis, soil erosion prediction, the impact on the ecological environment factors and degree of impact on the basin and regional environment and ecosystems of the comprehensive impact.
environmental protection measures
according to the policy and regulations on environmental protection, soil and water conservation, the feasibility and effect of the management plan are analyzed and demonstrated on the factors and degree of influence of the possible ecological environment.
Analysis of the impact of address disasters
projects built in geological disaster-prone areas and projects prone to geological disasters should elaborate on the geological disaster situation at the site of the project construction, analyze the risk of geological disaster induced by the proposed project, and propose countermeasures and measures for defense.
Special environmental impacts
to analyse the possible adverse effects of the proposed project on historical and cultural heritage, natural heritage, scenic spots and natural landscapes, and propose protective measures.
Chapter 7 economic impact analysis
first, economic cost benefits or cost effect analysis
from the point of view of optimizing the allocation of social resources, the economic rationality of the proposed project is evaluated by analyzing the economic cost benefit or cost effect.
Industry impact analysis
this paper expounds the basic situation of the industry and the position of enterprises in the industry, analyzes the impact of the proposed project on the development of the industry and related industries, and demonstrates whether it may lead to monopoly.
Analysis of regional economic impact
for projects that may have a significant impact on the regional economy, it should be analyzed and demonstrated from the perspectives of regional economic development, industrial space layout, local fiscal revenue, social income distribution and market competition structure.
Analysis of macroeconomic impacts
the macroeconomic impact analysis should be carried out on projects with large investment scale and great impact on the national economy. projects involving national economic security should analyze the impact of the proposed project on economic security and propose measures to maintain economic security.
Chapter 8 social impact analysis
The effect of social impact analysis
The possible social impact and social benefits of the construction and operation activities of the proposed project on the site of the proposed project are expounded.
Social adaptability analysis
The project application report analyzes whether the proposed project can be accepted by the local social environment and human conditions, and evaluates the adaptability of the project with the local social environment.
Social risks and countermeasure analysis
In view of the social factors involved in the construction of the project, the social analysis is carried out, and the measures to coordinate the relationship between the project and the local society, avoid social risks and promote the smooth implementation of the project are put forward.
No comments:
Post a Comment