Monday, 24 January 2022

What is the best project management method for manufacturing by classification?




Project Management Tool SI Object Browser PM (PM) is an integrated project management tool that released the "Manufacturing Version" in addition to products for the IT industry last spring.

looking at this export, you may be wondering, "manufacturing version?"

According to the statistical classification of the Ministry of Internal Affairs and Communications, there are 24 types of industry codes (medium classification) of manufacturing alone, and there are as many as 700 types when it comes to small classifications. In this blog, we will introduce which industries of manufacturing can be effective with PM's project management functions.


classification of manufacturing industry



this chapter organizes the classification of manufacturing. the products made by the manufacturing industry are broadly divided into two categories.

  • consumer goods: what consumers use for final consumption.
  • items purchased at nearby supermarkets and convenience stores (nearest products: groceries, daily necessities, etc.)
  • purchases at specialty stores and department stores (shopping: clothing, shoes, bags, home appliances, etc.)
  • what to buy at specialty stores (specialty products: automobiles, luxury furniture, precious metals, etc.)
  • production goods: those used by corporations (public institutions) to make a profit in the production and management activities of goods.
  • main equipment (essential for management activities and requires large investments)
  • auxiliary equipment (frequently purchased and mechanically purchased)
  • raw materials (basic products) semi-finished products (final products of an industry: steel, steel pipes, iron plates, wood, glass, etc.) parts (storage batteries, plugs in the world, tires, etc.)



MANY MANUFACTURING INDUSTRIES THAT ARE CONSIDERED BY PM MANUFACTURE PRODUCTION GOODS. AMONG THEM, I THINK THAT THERE ARE OVERWHELMINGLY MANY COMPANIES THAT PRODUCE MAJOR EQUIPMENT.

what are projects in the manufacturing industry?



since the release of the manufacturing version of pm, there are more opportunities to exhibit at exhibitions in various places, but customers who come to the booth often ask questions about what can be managed with project management? in the manufacturing industry, daily work is rarely described as a project, so i feel that the image of business does not boil when it is a keyword of project management. if you tell "process control" or "number control", you can listen to the product introduction , saying that "is it suitable for your company's business?"



1it systems in the manufacturing industry




it is a general it system in the manufacturing industry. many companies have a production management system in place to manage performance. there is also a scratch system made according to our own manufacturing, but many companies that visited have introduced a production management system (erp). after mass production prototypes, there is no turn of pm in the area of repeated production. pm has received many proposal opportunities from companies that manufacture projects up to prototype development and mass production before this work, and products close to individual order production, such as machine manufacturers. recently, there have been more opportunities for multiple teams to consider long-term r&d projects.


project management needs in manufacturing by classification



category 1: pan-pan engineering management



companies that have a production management system have been able to manage their daily results well, but they seem to be struggling at the stage of production planning. (it systems in the manufacturing industry (1))


the other day, we asked a customer who visited the problem that the production plan output from erp is combined according to the delivery date, so there are no instructions depending on the day, and one day it is not possible to level. at the stage of production planning, i don't think many companies use external tools such as production scheduler to create production plans.


pm is a need for individual make-to-order production planning that is difficult to manage with erp and scheduler. machine manufacturers that have case studies have product models that suit their applications, but most projects are customized to meet the needs of customers. in addition, in the contract manufacturing of drugs that we proposed recently, raw materials are supplied from pharmaceutical manufacturers, so plans were made while checking the available people and equipment by a predetermined deadline. in individual make-to-order production with different requirements each time, it is difficult to plan by scheduler because the tat is not constant, and many companies plan in excel.


pm can template lead times for each process for each manufacturing model. new deals call the manufacturing model template during the planning phase and modify the process tasks in the template to meet individual order requirements, but the template allows you to quickly create a highly accurate plan without nukemole. in addition, pm makes it easy to register man-hours performance and the progress rate of each task, so you can grasp the progress in real time by number. since the final cost by number is managed by the production management system, the registered man-hours results are linked to the production management system using the data output function.


classification 2: information sharing between departments in prototype development


"
prototypes and development of the next product are carried out for finished products that are regularly remodeled. the timing of the model change varies depending on the product, but it is carried out in a cycle of 1 year for short ones and 5 years for long ones. (it systems in the manufacturing industry (2))"



in the prototype development up to this work, development is advanced by incorporating defects of the current product, requests from customers, and new needs shared by sales representatives. prototype development starts with product planning and proceeds with the flow of design, prototyping and testing, process design, mass production prototype, but design review is carried out at the final stage of each process.


2 design reviews conducted in each process


PM allows you to record the results of a design review with the Milestone feature. Set milestones at the required timing of each process in the Gantt Chart Screen. When registering milestones, you can set the quality standards and review patterns of each process registered in the domain (template) in advance. At the end of each prototype development process, you can record the results of a design review by calling the required milestones from the milestone list.


classification 3: progress report in research and development


finally, we will introduce the needs of pm in research and development. (it systems in the manufacturing industry (3))


recently, we proposed pm in project management during the r&d phase. the company said that more than 10 teams were developing individual research themes over a period of four years. when we visited, we had already seen several tools such as open source project management tools, but we concluded that the tools we examined had many registration steps that could be managed in various ways and did not fit the project management of r&d. in qa after introducing the functions of pm, we were asked "is there a function to report weekly?", so when we introduced the weekly report function of project members implemented in version 5.5, it has been highly evaluated that it is close to the current weekly report.


3PM WEEKLY REPORTING


in research and development to develop elemental technologies, how to proceed with the plan is delegated to each team, so detailed task management may not be necessary. i felt that it was more important to have a system that allows the department to share the results and achievements of activities on research themes.


ENHANCEMENT OF FUTURE PM MANUFACTURING VERSION


in the year since the release of the manufacturing version, i have visited a number of manufacturing industries, but i have found that there is a different project management need than it companies. in particular, what i feel is different from the project of an it company is that the organization is divided in each process.



4 process control in the manufacturing industry



since the design department manages the design process of multiple calls and the manufacturing department manages the manufacturing process of multiple production units, the progress of all production numbers that are moving across the company is shared by the planning department periodically collecting information and dropping it into the large process table. if one process is delayed, it will affect the next process and other manufacturing processes, so there are many requests to alert you to delays. 

 

in addition, for design reviews, the current pm specifications for the quality control department to register the review results on behalf of them, but there are many requests that we want to leave the evaluation results of reviewers in each department that participated in the review.


pm's manufacturing version has only been released for one year, but we have already received many requests. please look forward to the requests you have been able to reflect in future upgrades as a general-purpose function that many customers can use.



No comments:

Post a Comment